The Meineng Energy facility is currently being equipped with all required infrastructure to provide for the assembly and test of ZBB EnerStore and ZBB EnerSection power and energy control center products.

The facility is scheduled to be fully operational in April 2012, and is designed to offer production capacity up to 75MWh per year.

Meineng Energy is presently preparing to take delivery of and install at designated customer sites ZBB EnerStore and ZBB EnerSection units that are being assembled and tested at the ZBB factory in Menomonee Falls.

The deal will allow Meineng Energy to assemble, test and deliver products from the Wuhu factory.