These drill length intersections include:
141.2 ppm (0.014%) U3O8 over 53.0 m from surface in SS-09-88,
120.3 ppm (0.012%) U3O8 over 74.15 m from 107.8 m in SS-09-90,
101.0 ppm (0.010%) U3O8 over 41.18 m from 161.8 m in SS-09-91,
345.1 ppm (0.035%) U3O8 over 22.03 m from 22.27 m in SS-09-92,
96.0 ppm (0.010%) U3O8 over 53.0 m from 160.4 m in SS-09-95
Mineralization at Double S remains open along strike and both updip and downdip from the areas of current drilling. Overall size of the Double S zone has increased to 1500 meters in length and up to 750 meters in width.
Uranium mineralization on the property continues to occur as broad multiple stacked mineralized zones hosted by granites and pegmatites, with significant drilled widths ranging from 9 meters to 74.15 meters. Uranium grades range from 96 ppm (0.010%) to 345 ppm (0.035%) U3O8.
A total of 4,181.3 meters in 15 diamond drill holes was completed from June to September 2009. Uracan’s summer drilling objective was achieved by expanding the Double S zone mineralization to the southeast.