The firm has completed the planned exploration and infill drilling program of 82 bore holes that was designed to provide sufficient detail for an initial NI 43-101 resource estimate to be undertaken on the southern 3km of the Berlin project.

Assays from the 63 drill holes disclosed so far confirm excellent continuity of mineralization in the fertile layer at Berlin.

Results from six trenches in the northern part of the 10.5km mineralized trend highlight the potential of the Berlin project to contain a resource substantially in excess of the historic resource.

The mineralized layer in the Berlin project occurs as a canoe-shaped fold that, in cross-section, has an asymmetric.

Â