The field is located off the coast of Nigeria in Block OML 120/121, at water depths reaching 410 meters.
The contract includes the engineering, fabrication and installation of close to 20 kilometers of flexible production, water injection and gas injection flowlines and risers. It also includes the installation of close to 15 kilometers of umbilicals supplied by the client.
The offshore installation is scheduled for the summer of 2009 and will be carried out by the Constructor, one of the Technip’s pipelay and construction vessels.
Technip’s operating center in Paris, France, will execute this contract. The flexible flowlines and risers will be fabricated by Technip’s Le Trait plant, France, one of the group’s flexible pipe production facilities.