Table 7: Some Small Scale Hydropower Projects with their Development status Name of the river Site Location Potential capacity in kW Supplying/Expected to supply Development status Ruvuma Sunda 3000 Tunduru Feasibility study Ruvuma Nakatuta 9000 Songea/Mbinga Feasibility study Ruvuma Lupilo 1400 Songea Feasibility Study Luaita Mbiga 300 Mbinga Feasibility Study Luwika L. Nyansashore 1400 Mbamba Bay Reconnaissance Ruhudje Njombe 3000 Njombe Prefeasibility Lupa Rukwa valley 3800 Chumya Reconnaissance Malagarasi Uvinza 6400 Kigoma Reconnaissance Kasulu Reconnaissance Uvinza Feasibility Luiche Nkungwe 4000 Uvinza Prefeasibility Biharamulo Game Reserve 200 Biharamulo Prefeasibility Ngono Kalebe 2500 Bukoba Prefeasibility Hainu Mbulu 1500 Mbulu Feasibility Mto wa simba Mto wa mbu 1500 Babati Prefeasibility Hagafiro Uwemba 800 Uwemba Constructed TOTAL 11.3 MW