Table 2: Hydro power in Kagera river basin
S/N |
Project Name |
Power (MW) |
Status/Remarks |
1 |
Kishanda |
166 |
Prefeasibility study, not constructed |
2 |
Kyanshoro Alt.I |
123 |
Prefeasibility study, not constructed |
3 |
Kyanshoro Alt.II |
46 |
Prefeasibility study, not constructed |
4 |
Murongo |
38 |
Prefeasibility study, not constructed |
5 |
Kakono |
30 |
Prefeasibility Study, not constructed |
|
Total |
403 MW |
|
|