Table 1: Preliminary Energy and Revenue Calculations Results
Item Description |
Value |
Units |
FSL of the reservoir |
+1146 |
m asl |
MSL of the reservoir |
+1141 |
m. asl |
Level at the bypass inlet in the dam |
+1135 |
m asl |
Level at the bottom of the dam i.e. bypass pipe outlet |
+1125 |
m asl |
Head (1141-1125 m.a.s.l) |
16 |
m |
Water Flow (1.5-2.0 m3/s) |
2 |
m3/sec |
Acceleration due to gravity |
9.81 |
m2/sec |
Water Density, |
1000 |
kg/m3 |
Power |
266.8 |
kW |
Annual Plant utilization |
7500 |
Hrs/year |
Annual Energy (kWh) |
2,001,240 |
kWh |
Energy unit price (Average to the consumer) |
75 |
TZS/kWh |
Revenue/year (TZS) |
150,093,000.00 |
TZS |
Annual Revenues in TZS (Million) |
150 |
TZS in Million |
|