Table 1 Settlements end of construction along the dam centerline sections for Section A, B and C H L DelL1 DelL-d/s Mv (u/s fill) Mv (d/s fill) Section A 2040 40 50 2.1 2.6 21.3 16.6 2010 70 20 1.6 1.6 19.8 19.0 Section B 2040 40 100 2.6 2.5 33.7 35.8 2010 70 70 2.6 3.0 41.9 35.9 1975 105 30 2.1 2.2 33.0 31.8 Section C 2040 40 70 2.1 1.8 29.3 34.2 2010 70 40 2.4 2.4 26.2 25.7 Average 29.3 28.4