Table 1: CFRDs in Turkey

(*) WS = Water supply, E = Energy, I = Irrigation, FC = Flood control
(**) U/C = Under construction
(***) It is the municipal use in hm3/yr

Dam Purpose* Height from foundation (m) Completed year** Volume of embankment (hm3) Reservoir Irrigation area (ha) Energy
Area (km2) Volume (hm3) Installed capacity (MW) Produced electricity (GWh/yr)
Atasu WS+E 118 U/C 3.8 .83 37.5 45 150
Dim WS+I+FC+E 134.5 U/C 5.0 4.5 253.0 5312 38.3 123
Gordes I+WS 94.9 U/C 5.5 14.05 448.5 14423
Kurtun E 133 2003 3.8 2.08 80.3 80 198
Marmaris WS+I 74 2005 1.3 30.0 7.5***
Torul E 152 U/C 4.6 3.62 168.0 103 322