In Huron, the 20MW project is being engineered and constructed by Cupertino Electric, under a five-year PG&E clean energy initiative, which includes up to 250MW of utility-owned solar generation.

PG&E expects to complete the entire 20MW project and grid inter-connection by mid-2012.

US-based Cupertino Electric is a provider of engineering and construction services.