New hydro power capacity requirements as identified by the Vision Paper
|
Plan Period |
Likely hydro |
Likely funds |
|
capacity addition |
requirement |
|
(MW) |
(US$) |
9th Plan (1997-2002) |
5800 |
4.7B |
10th Plan (2002-2007) |
10,432 |
8.5B |
11th Plan (2007-2012) |
21,288 |
17.4B |
12th Plan (2012-2017) |
23,000 |
18.8B |
13th Plan (2017-2022) |
31,000 |
25.3B |
Part 14th Plan (2022-2026) |
35,000 |
28.5B |
Total |
126,520 |
103.2B |
India’s vision aims for 32% hydro power
|
|
|