The order is expected to ship in the fourth quarter of the company’s current fiscal year.
The aeration system, which is designed to treat six million gallons per day, will remove hydrogen sulfide dissolved gas from contaminated groundwater as part of the process to make the groundwater suitable for public use.
All equipment will be constructed of Duall’s unique NSF approved DUALLast FRP with thermoplastic inner liner for superior strength and corrosion resistance.
The complete system will be fabricated at the Met-Pro Environmental Air Solutions Owosso manufacturing facility in Michigan, US.
Met-Pro is a provider of product recovery, pollution control, fluid handling and filtration solutions.