The drill hole 718 confirm new mineralization near the unconformity at Far East, in a zone much shallower than the main zone outlined by previous drilling.
The 2011 drill program at Roughrider used two drill rigs for nine weeks to complete 9,600m in 20 drill holes, of which 19 were at the Far East Zone.
Based on results, Hathor will plan a exploration drill program in 2012 at the project with focus on the Far East Zone.
Samples were chemically analyzed at the Geoanalytical Laboratories of the Saskatchewan Research Council (SRC) using ISO/IEC 17025:2005-accredited U3O8 method.