The company will install 19 miles of 10-inch export oil pipeline, 17 miles of 14-inch gas pipeline, 10 miles of 6-inch insulated rigid flowlines, six flexible risers, nine jumpers and jumper tie-ins, three subsea manifolds, six PLETs, and other additional equipment.
Global will use certain vessels for this project that includes the 485ft DLB Hercules, a DP-2 equipped vessel with a crane capable of lifting 2,000 tons and the Global Orion, a DP-2 equipped multi-service vessel.
The company will also use the Olympic Challenger, a 347ft, DP-2 multi-service subsea construction vessel, equipped with two 200hp Schilling UHD ROVs and the Chickasaw, a 275ft reel ship.
The project is located in 3,000 FSW and is slated to begin in May.