Three of FlexEnergy Inc’s Flex Turbine MT250s have been shipped to the BP facility.
The 750kW system will effectively utilize pipeline natural gas to produce continuous power and will power 100% of BP’s on-site loads in the absence of a utility infrastructure.
Furthermore, this Flex turbine system also allows BP to grow operations while maintaining air quality compliance in a highly regulated environment.