The first hole on line 585E, PLS13-098, which is located approximately halfway between the R390E and R780E zones, has intersected 76m composite mineralization which includes 7.62m total composite off-scale radioactivity.
Fission Uranium president, COO, and chief geologist Ross McElroy said a considerable breadth of mineralization and off-scale radioactivity has been intersected at the first hole of Zone R585E.
"Just as important is the location – R585E halves the gap between high-grade zones R390E and R780E. This narrowing of the distance between zones is continued proof that PLS is host to a mineralized system of considerable size and strength," McElroy added.
The 31,039 ha PLS project 50/50 joint venture held by Fission Uranium and Alpha Minerals.