The EWS-16 well flowed water-free oil with a rate of 370bbl/day and found a net oil pay of 17m.

The well reached a target depth within the Jurassic P reservoir at 1,823m and is now being connected to the existing production facilities.

The EWS-391 well encountered producing Jurassic P reservoir at 1,862m and results of wire line logging have indicated the presence of four-meter of net oil pay.

This well will be connected to existing production facilities upon completion of testing, the company said.