The turbines are to range in capacity from 100kW-12MW.

edf plans to have an approved shortlist of prequalified suppliers to whom it will turn when turbines are required. The power utility is looking for both turbine manufacturers and turnkey contractors to help match the works that may be required at different plants.

The utility added that there was no deadline on the qualification procedure.

For further details, contact:

edf – Direction des Achats, Savoie Technolac,
Attn: Frédérique Armand, F-73373 Le Bourget du Lac.
Tel. (33) 479 60 60 47.
Email: frederique.armand @ edf.fr.
Fax(33) 479 60 63 44