The 1MW solar photovoltaic facilities, which were acquired from ESA Renewables, include the 4,298-panel Murphy Farm solar project, the 4,340-panel Wingate solar project, and the 4,242-panel Holiness solar project.
Electricity generated by each of these solar farms is sold through Blue Ridge Mountain EMC to the Tennessee Valley Authority (TVA).
TVA will also receive the renewable energy certificates created by the projects, which are located in or near the town of Murphy.
ESA Renewables will handle operations, monitoring and maintenance at each of the solar farms.