A field crew are planned to be mobilized to conduct a modern Moving Loop Time Domain Electromagnetic ground survey within the next 1-2 weeks to confirm the historic electromagnetic (EM) geophysics over the property.

Scheduled to commence as soon as practical after seasonal break-up conditions, the drill campaign would comprise up to 15 drill holes.

Lakeland is seeking permits to enable the JV to drill up to 52 drill holes on the Property while all of the current targets located on dry land can be easily accessed in winter and summer, the Declan Resources said.

The Gibbon’s Creek property includes five contiguous claims totaling 12,771ha, located less than 3km from the settlement of Stony Rapids.