The project, located in Carson, involves implementation of Aecom’s enhanced in-situ bioremediation (EISB), which chemically remediates ground water aquifers.
EISB will address three highly toxic carcinogenic compounds, 1,2-dichloroethane, trichloroethylene and vinyl chloride, Aecom said.
CEI has agreed to provide the control system engineering, programming, control panel design and fabrication for the groundwater remediation project.
CEI will also provide startup support and training to manage 41 separate extraction/injection wells and chemical treatment compounds for the facility, which will be fully automated and allow total remote monitoring and control via Internet based software.
All the extraction wells and booster pumps will use a VFD speed control to optimize energy use and improve overall efficiency.
CEI is a subsidiary of GreenHouse, a provider of energy efficiency and sustainable infrastructure products.
GreenHouse designs, engineers and installs disparate products and technologies that enable its clients to reduce their energy costs and carbon footprint.
Aecom is a provider of professional technical and management support services for transportation, facilities, environmental, energy, water and government.