The study will be performed during last half of 2009 and will be focused on demonstrating the feasibility of the Sevan floating platform for the challenging conditions at the field located West of Shetland. Study scope will cover hull sizing and configuration, topsides engineering, mooring, motion and stability analysis, marine operations, risk identification as well as cost and schedule estimation.