Till date, the well has intersected a total net coal thickness of 12mt with initial field gas content up to 11 m3/tonne (after two days on desorption test). The proposed total depth for the well is approximately 900mt.

Stainburn Downs 1 at ATP 813P Galilee basin (Blue Energy 100%), the Lucas- Mitchell rig 180 spudded the Stainburn Downs 1 corehole on January 19, 2010. The well is currently at a depth of 908mt and drilling ahead in the Triassic Rewan formation towards an intermediate casing point of around 940mt.

The coring operations through the Permian Betts Creek formation target will commence after intermediate casing has been set. The total depth for the well is expected to be around 1,220mt.