A123 said the advanced energy storage solution is designed to smooth variable wind power generation, which is expected to help maintain the stability to Maui’s electric grid.
When fully operational, the 21MW Auwahi wind power project is expected to be capable of generating enough energy to power the equivalent of 10,000 homes.
The Hawaii Public Utilities Commission has approved a 20-year contract for Maui Electric Company to purchase the electricity produced at Auwahi.
A123’s GBS storage system is designed to facilitate the smooth and efficient operation of the wind farm, helping Sempra Generation maintain the consistent delivery of clean, emission-free energy to Maui Electric.
In addition, A123’s Smart Grid Domain Controller will manage voltage regulation requirements for the project, leveraging the battery system and other assets including substation capacitor banks.
A123 Systems is a developer and manufacturer of advanced lithium-ion batteries and energy storage systems for transportation, electric grid and commercial applications.