The approved on-grid tariff for the wind farm is RMB699/ MWh (inclusive of VAT).
The wind farm started construction on November 18, 2008 and the first unit commenced commercial operation on April 6, 2009. The construction period is less than seven months. China Resources Power owns a 100% equity interest in the wind farm. With the commencement of commercial operation of Shalong wind farm, the total operational wind power capacity of China Resources Power reaches 182 MW.