The drilling program will include step out drilling following the previously discovered wide zones of uranium anomalism at the firms’ Giant and Relief Well prospects.

With this drill program, the firm will test the depth, width and consistency of uranium mineralisation across the main radiometric anomaly at the expanded Giant prospect.

The phase one of the drilling will include a drill program of 1700m over three lines spaced 320m apart, with drill hole spacing’s at 20m and discretion to infill to 10m.

The recent drilling at Giant prospect including drilling, has outlined a conceptual exploration target of between 900,000lbs to 1,100,000lbs grading 120 – 150ppm uranium.