According to the company, the eastern-most hole at R945E, PLS13-099 (line 960E), returned a total composite mineralization of 121m over a 170.5m section.
Intervals include 3.99% U3O8 over 17m, including a higher grade interval of 18.52% U3O8 over 3.5m.
Both holes PLS13-090 (line 1155E) and PLS13-103 (line 1155E) returned mineralization over wide intervals in a geologic setting similar to the high-grade zones to the west.
Fission president, COO, and chief geologist Ross McElroy said that the company is encouraged by the confirmation of R1155E as a mineralized zone a full 195m east of R945E.
"The winter 2014 drill program will continue to explore the high-grade expansion on the eastern side of R945E as we work to eliminate the distance between zones to the west," McElroy added.
The R945E zone is currently being tested over 30m of strike length in four holes, while Drillhole PLS13-099 (line 960E) was collared as a vertical hole and was completed at a depth of 368.0m.