The drilling program will be determined from the use of the hydrocarbon imaging plat that has been completed as well as geological studies.
The initial drilling well location has been picked with the survey and construction of the location will be completed prior to drilling.
The company said it is in discussions with drilling contractors to determine the availability and time frame for a rig.