The project covers 13,497 hectares in 12 mineral claims on the southwest margin of the Athabasca Basin in the Broach Lake – Patterson Lake area.

A ground radon/radiometric survey will be carried out over an area with strongly anomalous historical radon/radiometric values, coincident with an extension of the Patterson conductor corridor.

The conductors appear to have been disrupted by cross cutting structures, inferring major fault off-setting, which is possibly significant to uranium mineralization.

In addition, a geochemical survey will be completed over an apparent 900m radioactive boulder train identified by a high resolution magnetic and radiometric survey completed in October 2009.

Fission Energy and ESO Uranium each hold a 50% interest in the Patterson Lake South Property.