Production has been restored to this level through the replacement of a dual ESP system with slightly larger pumps providing greater operational flexibility and prolonged run life, the company said.
The well was producing at approximately 2,800bopd before the loss of pump assisted flow.
Ithaca Energy operates the Jacky field with 47.5% interest, while Dyas UK and North Sea
Energy (UK) hold 42.5% and 10% interests, respectively.
Ithaca Energy is an oil and gas exploration, development and production firm active
in the UK Continental Shelf.