Drilling has confirmed three mineralised prospects within the project that include Buffalo, Elephant and Lion.
The company has to date completed about 600m of a planned 5000m drill program. Drilling is expected to speed up with the start of double shift drilling.
It is targeting near surface, high grade mineralisation within the project area, and is designed to deliver a maiden JORC 2012 resource estimate at the project.
The company expects to complete diamond drilling by August 2015.
Metals of Africa managing director Cherie Leeden said: "We continue to receive very encouraging laboratory results, with several more batches expected to be received over the coming months. Our most recent lab results have confirmed 50m of high grade and large flake graphite, grading at 9.6% TGC from the surface at the Buffalo prospect.
"Our results also indicate that the Lion Prospect is likely to be of economic interest. Currently the diamond drill rig is drilling at our Elephant prospect where the last hole intersected sensational looking graphite from 8m to 93m."