The PipelineManager solution provides the St Fergus control room with a compositional model of the FUKA pipeline.
PipelineManager allows the control room to forecast the arrival specification of gas.
PipelineManager performs as a safety function, through monitoring of the pipeline high pressure/low pressure interface.
It allows operational team to run ‘what-if’ scenarios to optimize inventory and pipeline performance.
In addition, it provides a system that will be capable of expanding with Total’s requirements beyond 2014 to include the SIRGE tie-in for the new West of Shetland operational hub.