The Gjoa field is located in blocks 35/9 and 36/7 on the Norwegian Continental Shelf. Detailed design and the other equipment will be provided by StatoilHydro. Offshore installation is scheduled for 2009.
Technip’s operating center in Oslo, Norway, will execute the contract, which includes installation engineering, procurement of installation equipment, fabrication and installation of subsea structures, spools and protection covers, tie-in and commissioning.