Vjosa river cascade proposal

Name MW Annual generation GWh Catchment km2 Average flow m3/sec
Kaludh 75 280 2370 63
Badelonje 30 140 2780 74
Permet 25 115 2820 75
Kelcyre 35 165 3240 88
Dragot 130 580 5030 144
Kalivac 90 400
Pocem 50 200 5570 159
Selenice 60 275 5710 163
Total: 495MW 2155GWH