Table 1: Mexico’s operational hydroelectric scheme

Source: Comision Federal de Electricidad (CFE)

Scheme Location Operator Configuration Operation T/G supplier
Aguamilpa NAY Comision Federal d’Electricidade (CFE) 3 X 320MW Francis 1994 Hydroenergo, Siemens
Aguaprieta JAL CFE 2 X 120MW Pelton 1993 Sulzer Escher Wyss, Toshiba
Angostura CHIS CFE 5 X 180MW Francis 1976-1978 Escher Wyss, Asea
Bacurato SIN CFE 2 X 46MW Francis 1987 Escher Wyss, Toshiba
Chicoasen CHIS CFE 5 X 300MW, 3 X 310MW Francis 1980-2005 MHI, Asea, Alstom
El Caracol (Ingeniero Carlos Ramrez Ulloa) GRO CFE 3 X 198MW 1986-1987 MHI, Ansaldo
Comedero (Raul Marsal) SIN CFE 2 X 50MW Francis 1991 Escher Wyss, Toshiba
Huites (Closio) SIN CFE 2 X 220MW Francis 1995-1996 LMZ, Siemens
Ixtapantongo DF CFE 2 X 28MW, 1 X 52MW Francis 1944-1954 Baldwin, Voith, WHC, Oerlikon
Malpaso CHIS CFE 6 X 180MW Francis 1969-1977 MHI., Escher Wyss, Asea
Santa Rosa JAL CFE 2 X 31MW Francis 1064 Toshiba
Trojes MIC Corporacn Mexicana de Hidroelectricidad SA de CV (Comexhidro) 1 X 8MW Francis 2003 Alstom, VA TECH
Zimapan HGO CFE 2 X 146MW Pelton 1996 Kvaerner, ABB