Table 1: Hydro power in the Rufiji Basin

S/N Project name Power (MW) Remarks/Status
1 Stieglers Gorge 2100 Detailed design, not constructed
2 Mpanga 165 Prefeasibility study, not constructed
3 Ruhudji 358 Feasibility study, not constructed
4 Mnyera 485 Reconnaissance study, not constructed
5 Iringa 87 Reconnaissance, not constructed
6 Lukose 130 Reconnaissance, not constructed
7 Mtera 80 Constructed, online since 1988
8 Kidatu 200 Constructed, online since 1975
9 Kihansi 180 Constructed, online since 1999
10 Kilombero (Kingenena’s and shughuli falls) 464 Reconnaissance, not constructed
Total 4249MW