Table I

*Drill Hole between gallery and downstream face of dam.

Station Previously Grouted ? Gallery Flow (gpm) Downstream Face Flow (gpm) Downstream Face Elevation (feet)
24+10 No 130 <2 Not Measured
25+20 Yes 894 2770 8114
26+50 No <2 10 8124
28+10 No <2 6 8156
28+65 Yes 5 20 7993
29+25 No <2 20 8129
30+95 No 10 <2 Not Measured
32+45 No <2 3 8088
34+40 No <2 3 8082
36+00 No <2 5 8116
36+75* No <2 5 7981
38+55 No <2 5 8104
40+15 Yes 2 5 8114
41+10 Yes 230 460 8092
42+85 Yes 7 330 8122