The equipment supplied by Struthers Wells is intended to assist Qatargas in maintaining production levels of its Qatar Gas-1 liquefied natural gas (LNG) project; increase the capacities of onshore processing facilities to meet additional volume, and increase the rate of gas feed.
The Qatar Gas-1 project consists of three trains at Ras Laffan, and has a combined production capability of 10 million tons per year.
The thermal reactor furnace and waste heat boiler will be shipped as a single unit, and the steam drum will be field attached to the waste heat boiler to aid the efficiency of field construction.
Technip provides project management, engineering and construction services for the oil & gas industry.