Initial results from the post-frac cleanup resulted in flow rates of 6.4mmcf per day and 100 barrels per day of condensate after three days of cleanup at a flowing casing pressure of 570psi.

The well was completed with a 15-stage frac over 1,315m of horizontal wellbore.

Donnybrook Energy expects overall liquids recovery to be 30bbls per mmcf (sales volume).

The well is tied-in and is scheduled to begin producing into the Keyera operated Simonette gas plant and ancillary gathering system, which has in excess of 80mmcf per day available processing capacity, on 3 February 2011.

Donnybrook Energy also reports that the company operated DEI HZ 16-27-61-2 W6M well at Resthaven (DEI 70%) reached total vertical depth of 3,390m on 28 January 2011.

The operations are underway to drill horizontally to a targeted total measured depth of approximately 5,000m of which 1,660m will be drilled horizontally through the Montney Formation.