Dong Energy and ESG have announced the completion of one of the most comprehensive pile testing campaigns ever, with initial results showing great cost reduction potential for the offshore wind industry.

Dong Energy and ESG have announced the completion of one of the most comprehensive pile testing campaigns ever, with initial results showing great cost reduction potential for the offshore wind industry.
The two orgnisations tested 28 piles on two different onshore sites in order to assist the development of new design methods for offshore wind farms. The testing has been undertaken by the joint industry project PISA and was performed to assess and validate a new design method developed by the PISA academic working group led by Oxford University and including Imperial College London and University College Dublin. The academic working group supervised the testing on site. Tests consisted primarily of pulling each of the 28 piles sideways into the soil until it failed.

Alastair Muir Wood, lead geotechnical engineer for Dong Energy and technical manager for the PISA Project, said: "We’re very pleased with the test results, which confirm that traditional design methods in these soils are very conservative. The results indicate that in these site conditions there may be opportunities for savings identified by reducing the quantity of steel in the foundation. In other words, there’s a savings potential that will contribute to reducing the cost of electricity."

The testing took place in Cowden, England and in Dunkirk, France. The clay till site in Cowden and the dense sand site in Dunkirk represent typical surface soil conditions found in much of the North Sea. Furthermore, both sites have previously been used for pile testing activities, mostly targeting oil and gas engineering, so that a rich amount of field and laboratory soil data is already available.
Bladt and Dansteel supplied piles of three different diameters for the tests. Those with a diameter of 2 metres were some of the largest ever tested. During testing, other instrumentation was used including fibre optic strain gauges installed by Marmota Industries. In total, 28 tests were conducted, primarily investigating the static monotonic but also the response under cyclic lateral loading.
Steve Turner, Project Director from ESG, who undertook the testing, said: "The PISA project has provided some of the most challenging testing we’ve ever undertaken. With the largest test, we were simultaneously monitoring more than 250 different precision instruments, whilst applying a load greater than 450 tons."
The PISA academic working group now has six months to analyse the data collected and use it to confirm the new design methods. Their final report is due to be delivered to the project partners in January 2016.
This testing has been undertaken as part of the research project PISA (pile soil analysis), which is being carried out by an industry working group headed by Dong Energy and involving EDF, RWE, Statoil, Statkraft, SSE, Scottish Power, Vattenfall, Alstom and Van Oord. PISA is being run under the framework of the Carbon Trust Offshore Wind Accelerator (OWA).