L&T will design, engineer, supply, erect and commission the BOP equipment and systems on an engineering, procurement and construction basis, as well as associated services.
The scope of the contract includes civil, structural and architectural works; coal and ash handling plants; chimney; natural draft cooling towers; switchyard; and BOP electrical.
The entire project is expected to be commissioned within 31 months.
L&T is a $9.8bn technology, engineering and construction group, with global operations.