Consortium to develop two 12 MW units

Humpuss Intermoda Transport plans to build a coal-fired plant at a cost of Rp200 billion ($21.3 million). Each of the two 12 MW units will be built by Humpuss Kaltindo Energy, a consortium of four companies which includes Intermoda Transport holding 55%, Timha Industri with 15%, Kutilang Paksi Mas with 17.5% and Findomuda Desain Cipta with 12.5%. The project is to be situated in Banka.