In addition, planning is underway for an approximate $8m winter 2011 drilling program to commence in January.
At the J-Zone, drill hole WAT10-111D, which extended mineralization approximately 15m to the east of hole WAT10-066, (12.0m grading 3.64% U3O8, including 1.50m of 27.38% U3O8, intersected 6.00m (209.5m-215.5m) grading 4.45% U3O8 at the unconformity, including 3.00m (209.50m-212.5m) at 8.54% U3O8.
This hole has extended high grade mineralization further to the east in the the J-Zone on line L015E, which was earlier identified as weakly mineralized as evidenced by Hole WAT10-096 located 10m to the north.
Hole WAT10-109, located in the north-central part of the J-Zone, intersected 5.50m grading 0.44% U3O8, including 2.00m at 1.08% U3O8.
At Highland, Hole WAT10-107A encountered weak mineralization at the unconformity, while Hole WAT10-108 intersected weak mineralization in the basement rocks.
Hole WAT10-110A at the J-East target, was not mineralized and alteration was weak.