The firm has planned a 25,000m drill program with 69 drill holes, by utilising three drill rigs.

About 75% of the drilling will be carried out at the J Zone high grade uranium discovery and the secondary target will be the Summit Zone, located 1km to the west of the J Zone.

Drilling will continue at other regional targets, including a total of nine drill holes at Oban, Oban North, and the new Chivas target, located about 5km west of the Oban Corridor and five drill holes planned at Murphy Lake.

The firm will also carry out geophysical work, including time domain electromagnetic (TDEM) and DC-resistivity surveys, at the Oban, Chivas, Murphy Lake, and Aaron Lake area.