Drilling was completed for 26 holes of 2,500 meters targeting interpreted extensions of the Curnamona and Namba palaeo-channel systems at the project.

Drill hole CUS012 intersected from 108.5 meters to 11 meters, 1.5m @ 67ppm eU308 in a dark, clayey interval in the Eyre Formation.

According to the results, area revealed that the Namba Formation is oxidised when compared to areas in the Curnamona North project and the proximity to granite basement is indicated by extensive mica in the lower Eyre Formation.

The results also showed a limestone unit separating the overlying Namba Formation from the Eyre Formation was present in many holes.