The two 24" gas export pipelines, E1 and W2, run from the Beregovaya gas compression station in Russia’s Arkhipo-Osipovka, 235 miles (378km) across the Black Sea, with a maximum water depth of approximately 2,150m, to the Durusu inlet terminal 40 miles (64km) from Samsun in Turkey. The in-field work in both areas has been completed and the reporting stage is now underway.
The Fugro-owned Atlantis Dweller was successfully mobilised in Istanbul at the end of August and is currently undertaking the external inspection of the offshore section.