Cooperation "RusHydro" and "Power Machines" has a long history. Russian company manufacturing hydraulic units are installed on the majority of the Volga-Kama cascade, the Sayano-Shushenskaya, Mainskaya, Zeya, Bureika, Kolyma and the Baksan hydroelectric power station. On the construction of the Boguchanskaya, Ust-Srednekanskaya and Nizhne-Bureya HPP and operated hydroelectric "Power Machines". Many hydropower within the framework of the comprehensive modernization of RusHydro have seen the second generation of hydraulic units. So on the Volga and Zhiguli hydropower plant replaced 14 machines in full swing reconstruction of the Cheboksary hydroelectric turbines.

Within the framework of a working meeting Nikolay Shulginov and Roman Filippov discussed the fulfillment of existing contracts and the possibility of concluding new ones. One of the last documents became a contract for the replacement of all hydraulic units Votkinsk hydroelectric power station, concluded in January this year. Deliveries of the new equipment will begin in 2016. At the same time start supplying parts for third hydro Ust-Srednekanskaya hydropower plants, which RusHydro is in the Magadan region. At the end of the meeting an agreement was reached on the modernization of hydraulic units of Rybinsk power plant, the life of which has expired.