Car Charging Group will also install EV charging stations for public use in the Maritime Garage and the Yankee Doodle Garage in Norwalk.

The company installed Level II ChargePoint Networked Charging Stations for EVs which are manufactured by Coulomb Technologies.

The 7.2kW output delivers Level II (208/240 VAC @ 30 A) charging via the standard SAE J1772 connector and fixed 18ft cable.

The 2kW output delivers Level I (120 VAC @ 16 A) charging via a standard NEMA 5-20 receptacle protected behind a locking door.

The Norwalk Parking Authority is responsible for the operations and maintenance of the city’s municipal parking system, consisting of four parking structures, six surface lots and on-street parking.