The 11-3-29X well was spud recently by the Pinpoint Drilling 10 rig and current operations are waiting on cement at the base of the Ft Apache reservoir.

Intermediate casing was landed and cemented at a depth of 1,515ft.

The well is targeting the Amos Wash reservoir at a depth of 1,560ft with total depth for the 11-3-29X well expected to be 1,790′.

The 11-3-29X well is located 100′ from the original 11-3-29 well drilled in 1995 and plugged and abandoned after testing approximately 2 million cubic feet of CO2 gas with a Helium content of 0.72%.