The drilling results include 39.43 grams of gold per tonne (cut) over 2.6m true width (hole U10-645), 28.18 grams of gold per tonne (cut) over 2.0m true width (hole U10-651) and 26.51 grams of gold per tonne (cut) over 1.5m true width (hole U10-642b).
In addition, the other results are 18.54 grams of gold per tonne (cut) over 3.8m true width (hole U10-349) and 15.43 grams of gold per tonne (cut) over 1.3m true width (hole U10-652).
In 2010, Claude will continue producing from the Seabee Gold Mine and expects to move Santoy 8 towards a commercial production decision in early 2011.
For the full year 2010, approximately 50,000m of surface and underground diamond drilling will be completed at the Seabee Gold Mine and surrounding satellite deposits.